Mainframe interview question on JCL and PROC.
Posted: Thu Dec 30, 2021 11:10 am
Interview question:
A job is executing 2 procs in its two steps.
Jobstep J1 exec P1 proc
Jobstep J2 exec P2 proc
In Proc P1, I am creating a GDG A.B.C(+1). In Proc P2, I want to refer to the same version. So In P2 do I refer to (+1) version or (0) version. And why.
A job is executing 2 procs in its two steps.
Jobstep J1 exec P1 proc
Jobstep J2 exec P2 proc
In Proc P1, I am creating a GDG A.B.C(+1). In Proc P2, I want to refer to the same version. So In P2 do I refer to (+1) version or (0) version. And why.